This process shall be responsible for collecting work zone data from a variety of sources in order to develop an overall view of the work zone status that can be output to centre personnel, forwarded to other processes for archival, or prepared for distribution to agencies beyond the maintenance and construction management facility collecting the data. The process shall collect both work zone activity plans and work zone status. The work zone data collected shall include video images from cameras located in or near the work zone. The work zone data collected shall also include inputs from field personnel, and inputs from work zone monitoring devices (such as intrusion detection or alert devices and speed monitoring devices) on-board the vehicle and at the roadside. The process shall collect work zone data from other maintenance and construction management entities. The process shall forward status of work zone activity collected from other maintenance and construction management entities to M&C Centre Personnel. The process shall collect operational status (state of the sensor device, configuration, and fault data) of devices used in the work zone and provide to another process to arrange field equipment or on-board vehicle equipment repair.
This PSpec is associated with the following Subsystem: Maintenance and Construction Management
This PSpec is associated with the following Equipment Packages: