Government of Canada navigation bar

Symbol of the Government of Canada

Primary site navigation bar

Disclosure of Grants and Contributions

2012-2013 – 3rd Quarter (October 1-December 31)

Please select the Recipient Name for Grants and Contributions details

Date Recipient Name Purpose Value
25/10/2012 American Association of State Highway and Transportation Officials (AASHTO) Develop a general concept for a National Connected Vehicle Field Infrastructure Footprint. $110,000.00
10/12/2012 British Columbia Ministry of Transportation and Infrastructure Highway 15 FAST Staging Area and Border Wait Time Measurement System. $1,000,000.00
27/11/2012 Canadian National Railway Company (CN) Grade Crossing Improvement Program projects that enhance the safety of public grade crossings on federally regulated railways. $7,383,015.00
17/12/2012 Canadian Transportation Research Forum Facilitate postgraduate R&D on transportation-related issues, promote & encourage transportation-related careers, & support transportation sector capacity-building by providing funding assistance for scholarships to be awarded by CTRF. $120,000.00
19/12/2012 City of Ottawa A 12.5 km electric LRT system from Tunney’s Pasture (west) to Blair Station (east); 13 stations to increase mobility, increase travel time savings and number of commuters through downtown Ottawa. $600,000,000.00
03/12/2012 Corporation of the Municipality of Red Lake Purchase an electronic runway condition reporting system $32,428.00
14/12/2012 County of Lethbridge Replacement of an existing runway condition reporting system. $34,618.00
14/12/2012 County of Lethbridge Replacement of a snowblower truck. $410,637.00
06/11/2012 Kenora Airport Authority Inc. Replacement of airfield electrical generator $98,868.00
26/11/2012 Montreal Port Authority Optimization of the navigation of the St-Lawrence River by implementing a marine intelligent transportation system tool to increase the capacity of the vessels. $500,000.00
13/12/2012 Port Metro Vancouver Construction of a two-lane elevated structure to grade separate rail tracks and the Deltaport Causeway to reduce delays and inefficiencies in rail and truck operations and to increase cargo handling capacity at Deltaport. $19,900,000.00
20/11/2012 Port Metro Vancouver The project will realign and elevate a 1.5 km stretch of Low Level Road to accommodate two new rail tracks that are essential to port terminal expansion on the North Shore of Burrard Inlet. $49,400,000.00
19/11/2012 Regional County Municipality of Manicouagan Acquisition of a towed runway sweeper at Baie-Comeau Airport. $178,358.00
26/11/2012 Saguenay Port Authority The construction of a 12.5 kilometre rail link between the Roberval-Saguenay mainline and the maritime terminal at Grande-Anse (Port of Saguenay) and an intermodal station that would provide warehousing and cargo manipulation facilities. $15,000,000.00
15/11/2012 Sault Ste. Marie Airport Development Corporation Replacement of an existing runway condition reporting system $29,602.00
30/11/2012 South Coast British Columbia Transportation Authority Develop a Best Practice Guideline for implementing Interoperable Radio-Frequency Identification Technology. $60,000.00
17/10/2012 Sudbury Airport Community Development Corporation Procurement of a snowblower $249,656.00
30/10/2012 Sydney Airport Authority Airports Capital Assistance Program - Replacement of the emergency power system - J.A. Douglas McCurdy Sydney Airport $454,130.00
12/10/2012 The Town of the Pas Purchase of snowplow truck $186,756.00
Date modified:
2017-10-21